Compliance
Master-Vault.

Cross-referenced regulatory data from AS/NZS 3000:2018, 3012, 3017, 3760, and SIR 2025.

Mandatory

AS/NZS 3000:2018 Wiring Rules

Protective Provisions

  • Insulation Resistance ≥ 1.0 MΩ
  • Earth Continuity ≤ 0.5 Ω
  • RCD Trip Time ≤ 300 ms

Verify isolation and render incapable of being energized before testing[cite: 3].

Selection & Environment

Solar Radiation [cite: 7]

Wiring systems exposed to direct sunlight must be UV resistant or appropriately shielded.

Voltage Drop [cite: 2]

Limit to 5% from point of supply to any point of the installation.

Site Ops

AS/NZS 3012 Construction Sites

Inspection Intervals

RCDs (Fixed/Portable) Monthly
Transportable Structures 6 Months

Critical Site Requirements

Mechanical

Lead stands or insulated hooks required to keep cables off the ground.

Switchboards

Must be robust, weatherproof, and secured to prevent accidental tipping.

SAPN 2025

Service & Installation Rules (SA)

Connection Point

Consumer mains voltage drop limited to < 2%. Ensure clearance to HV earthing systems.

Security Seals

Unauthorised interference with infrastructure is prohibited. Security seals must be applied to all metering points.

DER / Solar

Requirements for PV, batteries, and generators must align with section 8.

In-Service Test & Tag Intervals (AS/NZS 3760)

Equipment Environment Visual & Test Interval RCD (Push-Button)
Construction / Demolition 3 Months Daily (or before use)
Workshops / Manufacturing 6 Months 6 Months
Office Environment 5 Years 2 Years